Revit Pinoy
Welcome
<img src=http://www.anpradio.com/images/philippines.gif>

Login or Register To View on this site
And Please read the rules
and please obey them huh...

Thank's for Visiting
Revit Pinoy
Welcome
<img src=http://www.anpradio.com/images/philippines.gif>

Login or Register To View on this site
And Please read the rules
and please obey them huh...

Thank's for Visiting
Revit Pinoy
Would you like to react to this message? Create an account in a few clicks or log in to continue.


Where pinoy reviter meets.
 
HomePortalLatest imagesRegisterLog in
Our Gallery is now activated Click Here
How to Post In The Gallery Section: (more....)
Search
 
 

Display results as :
 
Rechercher Advanced Search
Latest topics
» how to make realistic grass using photoshop
P.D. No. 1096 EmptySat Jan 17, 2015 12:29 am by john_lou

» two storey ( big house)
P.D. No. 1096 EmptyMon Jan 12, 2015 9:26 pm by pedring

» Interior Naman
P.D. No. 1096 EmptyTue Dec 30, 2014 3:52 pm by ace234

» RevitPinoy shirt...for sale...4 colors available...
P.D. No. 1096 EmptyTue Jul 22, 2014 11:14 am by markitekdesign

» The Lonely Hearts Club Epub
P.D. No. 1096 EmptyMon Jul 21, 2014 7:52 am by Guest

» The L Word 2004
P.D. No. 1096 EmptyMon Jul 21, 2014 7:31 am by Guest

» Adobe.Flash.Player.11.5.502.146.Final.ouez.MaZiKa2daY.CoM.ra
P.D. No. 1096 EmptySat Jul 12, 2014 2:00 am by Guest

» Adobe.Flash.Player.11.5.502.146.Final.ouez.MaZiKa2daY.CoM.ra
P.D. No. 1096 EmptySat Jul 12, 2014 1:58 am by Guest

» Activar Windows 7 Rar
P.D. No. 1096 EmptyFri Jul 11, 2014 12:33 pm by Guest

Navigation
 Portal
 Index
 Memberlist
 Profile
 FAQ
 Search
Forum

 

 P.D. No. 1096

Go down 
AuthorMessage
markitekdesign
Admin
markitekdesign


Posts : 378
Join date : 2009-09-26
Age : 43
Location : Ortigas Centre,Philippines/Surprize,Arizona USA

P.D. No. 1096 Empty
PostSubject: P.D. No. 1096   P.D. No. 1096 EmptyMon Nov 16, 2009 1:38 pm

P.D. No. 1096
The 1977 National Building Code of the Philippines (NBCP)
2004 Revised Implementing Rules and Regulations (R-IRR)
Effective 01 May 2005

Notes: This material is posted here particularly since all registered and licensed architects (RLAs) must somehow know how to compute the cost of building permits in general, and architectural permits specifically. As agents of the Client, the RLAs must be able to properly (knowledgeably) apprise the Client of this major cost item and not be entirely reliant/ dependent on figures computed/ released/ assessed by third parties such as Construction Managers, Constructors and Building Officials.

A prior reading of the rest of the NBCP 2004 R-IRR (posted elsewhere in the Latest Publications section of this website) is required before an RLA can make full use of this document.


NEW SCHEDULE OF FEES AND OTHER CHARGES

1. Bases of assessment

a. Character of occupancy or use of building/structure

b. Cost of construction

c. Floor area

d. Height

2. Regardless of the type of construction, the cost of construction of any building/structure for the purpose of assessing the corresponding fees shall be based on the following table:

Table II.G.1. On Fixed Cost Of Construction Per Sq. Meter

LOCATION GROUP
All Cities and Municipalities A, B, C, D, E, G, H, I F J
P10, 000 P8, 000 P6, 000

3. Construction/addition/renovation/alteration of buildings/structures under Group/s and Sub-Divisions shall be assessed as follows:

a. Division A-1

Area in sq. meters Fee per sq. meter

i.
ii.

iii.
iv.
v.
vi. Original complete construction up to 20.00 sq.meters…….……….…
Additional/renovation/alteration up to 20.00 sq. meters
regardless of floor area of original construction...………….………….
Above 20.00 sq. meters to 50.00 sq. meters……………………………
Above 50.00 sq. meters to 100.00 sq. meters……..………….………
Above 100.00 sq. m to 150 sq. meters...……….………………………
Above 150.00 sq. meters………………………………….………….…. P 2.00

2.40
3.40
4.80
6.00
7.20

Sample Computation for Building Fee for a 75.00 sq. meters floor area:

Floor area = 75.00 sq. meters
Therefore area bracket is 3.a.iv.
Fee = P 4.80/sq. meter
Building Fee = 75.00 x 4.80 = P 360.00

b. Division A-2

Area in sq. meters Fee per sq. meter

i.
ii.

iii.
iv.
v. Original complete construction up to 20.00 sq. meters……….……….
Additional/renovation/alteration up to 20.00 sq. meters
regardless of floor area of original construction ………………………
Above 20.00 sq. meters to 50.00 sq. meters……………………………
Above 50.00 sq. meters to 100.00 sq. meters……………………….…
Above 150.00 sq. meters……….………………………………………… P 3.00
3.40
5.20 8.00
8.40


c. Divisions B-1/C-1/E-1, 2, 3/F-1/G-1, 2, 3, 4, 5/H-1, 2, 3, 4/I-1 and J-1, 2, 3

Area in sq. meters Fee per sq. meter

i.
ii.
iii.
iv.
v.
vi.
vii.
viii.
ix.
x. Up to 500…………………………………….……………...……………
Above 500 to 600………………………………..……...………………
Above 600 to 700…………………………………..…………………….
Above 700 to 800………………………………..……………..………
Above 800 to 900………………………………………………………
Above 900 to 1,000…………………………………..……..…………
Above 1,000 to 1,500……………………………………..…………...
Above 1,500 to 2,000……………………………………………………
Above 2,000 to 3,000……………………………………………………
Above 3,000……………..……….……………………………………… P 23.00 22.00
20.50
19.50
18.00
17.00
16.00
15.00
14.00
12.00

NOTE: Computation of the building fee for item 3.c. is cumulative. The total area is split up into sub-areas corresponding to the area bracket indicated in the Table above. Each sub-area and the fee corresponding to its area bracket are multiplied together. The building fee is the sum of the individual products as shown in the following example:

Sample Computation for Building Fee for a building having a floor area of 3,200 sq. meters:

First 500 sq. meters @ 23.00.………………………………………………..
Next 100 sq. meters @ 22.00.………………………………………………...
Next 100 sq. meters @ 20.50……………………………………………….…
Next 100 sq. meters @ 19.50………………………………………………...
Next 100 sq. meters @ 18.00……………………………………………….…
Next 100 sq. meters @ 17.00……………………………………………….…
Next 100 sq. meters @ 16.00……………………………………………….…
Next 500 sq. meters @ 15.00………………………………………………….
Next 1,000 sq. meters @ 14.00……………………………………………..
Last 200 sq. meters @ 12.00……………………………………………….…

Total Building Fee P










P 11,500.00
2,200.00
2,050.00
1,950.00
1,800.00
1,700.00
8,000.00
7,500.00
14,000.00
2,400.00
--------------- 53,100.00


d. Divisions C-2/D-1, 2, 3

Area in sq. meters Fee per sq. meter

i.
ii.
iii.
iv.
v.
vi.
vii.
viii.
ix
x. Up to 500….……………...…………………………………………....…
Above 500 to 600……...…………………………………………………
Above 600 to 700………………………………………………………
Above 700 to 800…………………………………..……………..……
Above 800 to 900…………………………………….………………..
Above 900 to 1,000……………………………………..……..………
Above 1,000 to 1,500………………………………………….………
Above 1,500 to 2,000………………………………………………..…
Above 2,000 to 3,000……………………………………………..……
Above 3,000……………..……….……………………………………… P 12.00
11.00
10.20
9.60
9.00
8.40
7.20
6.60
6.00
5.00

NOTE: Computation of the building fee in item 3.d. follows the example of Section 3.c. of this Schedule.

e. Division J-2 structures shall be assessed 50% of the rate of the principal building of which they are accessories (Sections 3.a. to 3.d.).

4. Electrical Fees

The following schedule shall be used for computing electrical fees in residential, institutional, commercial and industrial structures:


a. Total Connected Load (kVA)

Fee
i. 5 kVA or less……………………………….. P 200.00
ii. Over 5 kVA to 50 kVA……………..……… P 200.00 + P 20.00/kVA
iii. Over 50 kVA to 300 kVA………………….. 1,100.00 + 10.00/kVA
iv. Over 300 kVa to 1,500 kVA……………… 3,600.00 + 5.00/kVA
v. Over 1,500 kVA to 6,000 kVA…………… 9,600.00 + 2.50/kVA
vi. Over 6,000 kVA…………………………… 20,850.00 + 1.25/kVA

NOTE: Total Connected Load as shown in the load schedule.

b. Total Transformer/Uninterrupted Power Supply (UPS)/Generator Capacity (kVA)

Fee
i. 5 kVA or less……………………………….. P 40.00
ii. Over 5 kVA to 50 kVA……………..……… P 40.00 + P 4.00/kVA
iii. Over 50 kVA to 300 kVA………………….. 220.00 + 2.00/kVA
iv. Over 300 kVa to 1,500 kVA……………… 720.00 + 1.00/kVA
v. Over 1,500 kVA to 6,000 kVA…………… 1,920.00 + 0.50/kVA
vi. Over 6,000 kVA…………………………… 4,170.00 + 0.25/kVA

NOTE: Total Transformer/UPS/Generator Capacity shall include all transformer, UPS and generators which are owned/installed by the owner/applicant as shown in the electrical plans and specifications.

c. Pole/Attachment Location Plan Permit

i. Power Supply Pole Location………………………………… P 30.00/pole
ii. Guying Attachment…………………………………………… P 30.00/attachment

This applies to designs/installations within the premises.

d. Miscellaneous Fees: Electric Meter for union separation, alteration, reconnection or relocation and issuance of Wiring Permit:

Use or Character of
Occupancy Electric Meter Wiring Permit
Issuance

Residential P 15.00 P 15.00
Commercial/Industrial 60.00 36.00
Institutional 30.00 12.00

e. Formula for Computation of Fees

The Total Electrical Fees shall be the sum of Sections 4.a. to 4.d. of this Rule.

f. Forfeiture of Fees

If the electrical work or installation is found not in conformity with the minimum safety requirements of the Philippine Electrical Codes and the Electrical Engineering Law (RA 7920), and the Owner fails to perform corrective actions within the reasonable time provided by the Building Official, the latter and/or their duly authorized representative shall forthwith cancel the permit and the fees thereon shall be forfeited.

5. Mechanical Fees

a. Refrigeration, Air Conditioning and Mechanical Ventilation:

i. Refrigeration (cold storage), per ton or fraction thereof………….… P 40.00
ii. Ice Plants, per ton or fraction thereof………………………………... 60.00
iii. Packaged/Centralized Air Conditioning Systems:
Up to 100 tons, per ton………………………………………………...
90.00
iv. Every ton or fraction thereof above 100 tons………………………. 40.00
v. Window type air conditioners, per unit…………………………….…. 60.00
vi. Mechanical Ventilation, per kW or fraction thereof
of blower or fan, or metric equivalent………………………………...
40.00
vii. In a series of AC/REF systems located in one
establishment, the total installed tons of refrigeration
shall be used as the basis of computation for purposes
of installation/inspection fees, and shall not be considered
individually.

For evaluation purposes:

For Commercial/Industrial Refrigeration without Ice Making (refer to 5.a.i.):

1.10 kW per ton, for compressors up to 5 tons capacity.
1.00 kW per ton, for compressors above 5 tons up to 50 tons capacity.
0.97 kW per ton, for compressors above 50 tons capacity.

For Ice making (refer to 5.a.ii.):

3.50 kW per ton, for compressors up to 50 tons capacity.
3.25 kW per ton, for compressors above 5 up to 50 tons capacity.
3.00 kW per ton, for compressors above 50 tons capacity.

For Air conditioning (refer to 5.a.iii.):

0.90 kW per ton, for compressors 1.2 to 5 tons capacity.
0.80 kW per ton, for above 5 up to 50 tons capacity.
0.70 kW per ton, for compressors above 50 tons capacity.

b. Escalators and Moving Walks, funiculars and the like:

i. Escalator and moving walk, per kW or fraction thereof………….…. P 10.00
ii. Escalator and moving walks up to to 20.00 lineal meters
or fraction thereof……………………………………………………….
20.00
iii. Every lineal meter or fraction thereof in excess
of 20.00 lineal meters……………………………………………………
10.00
iv. Funicular, per kW or fraction thereof………………………………… 200.00
(a) Per lineal meter travel…………………………………..….……… 20.00
v. Cable car, per kW or fraction thereof………………………………… 40.00
(a) Per lineal meter travel……………………………………………… 5.00

c. Elevators, per unit:

i. Motor driven dumbwaiters……………………………………………. P 600.00
ii. Construction elevators for material………………………………….… 2,000.00
iii. Passenger elevators……………………………………………….….… 5,000.00
iv. Freight elevators…………………………………………………….…. 5,000.00
v. Car elevators………………………………………………………….... 5,000.00

d. Boilers, per kW:

i. Up to 7.5 kW…………………………………………………………… P 500.00
ii. Above 7.5 kW to 22 kW………………………………………………. 700.00
iii. Above 22 kW to 37 kW………………………………………………... 900.00
iv. Above 37 kW to 52 kW……………………………………………….… 1,200.00
v. Above 52 kW to 67 kW…………………………………………….…… 1,400.00
vi. Above 67 kW to 74 kW……………………………………………….… 1,600.00
vi. Every kW or fraction thereof above 74 kW…………………………… 5.00

NOTE: (a) Boiler rating shall be computed on the basis of 1.00
sq. meter of heating surface for one (1) boiler kW.
(b) Steam from this boiler used to propel any prime-mover
is exempted from fees.
(c) Steam engines/turbines/etc. propelled from geothermal
source will use the same schedule of fees above.

e. Pressurized water heaters, per unit………………………………………… P 200.00

f. Water, sump and sewage pumps for commercial/industrial use,
per kW or fraction thereof………………………………………………….. 60.00

g. Automatic fire sprinkler system, per sprinkler head…………………….. 4.00

h. Diesel/Gasoline ICE, Steam, Gas Turbine/Engine, Hydro,
Nuclear or solar Generating Units and the like, per kW:

i. Every kW up to 50 kW…….…………………………………………… P 25.00
ii. Above 50 kW up to 100 kW…………………………………………… 20.00
iii. Every kW above 100 kW……………………………………………….. 3.00

i. Compressed Air, Vacuum, Commercial,
Institutional and/or Industrial Gases, per outlet……………………………..P 20.00

j. Power piping for gas/ steam/ etc., per lineal meter
or fraction thereof of per cu. Meter or fraction thereof
whichever is higher…………………………………………………………….P 4.00


k. Other Internal Combustion Engines, including
cranes, forklifts, loaders, pumps, mixers, compressors
and the like, not registered with the LTO, per kW:

i. Up to 50 kW…..………………………………………………………… P 10.00
ii. Above 50 kW to 100 kW……………………………………………… 12.00
iii. Every above 100 kW or fraction thereof ……………………………… 3.00


l. Pressure Vessels, per cu. meter or fraction thereof………………………. P 60.00

m. Other Machinery/Equipment for commercial/
Industrial/Institutional Use not elsewhere specified,
per kW or fraction thereof……………………………………………………. P 60.00

n. Pneumatic tubes, Conveyors, Monorails for
materials handling and addition to existing supply
and/or exhaust duct works and the like,
per lineal metes or fraction thereof…………………………………………. P 10.00


NOTE: Transfer of machine/equipment location within a
building requires a mechanical permit and payment of fees.

6. Plumbing Fees

a. Installation Fees, one (1) “UNIT” composed of one (1) water closet, two (2) floor drains, one (1) lavatory, one (1) sink with ordinary trap, three (3) faucets and one (1) shower head. A partial part thereof shall be charged as that of the cost of a whole “UNIT”.

b. Every fixture in excess of one unit:

i. Each water closet…………………………………………….. P 7.00
ii. Each floor drain………………………………………………… 3.00
iii. Each sink……………………………………………………….. 3.00
iv. Each lavatory …………………………………………………… 7.00
ii. Each faucet……………………………………………………… 2.00
iii. Each shower head…………………………………………….. 2.00

Special Plumbing Fixtures:

i. Each slop sink………………………………………………… P 7.00
ii. Each urinal……………………………………………………. 4.00
iii. Each bath tub……..…………………………………………… 7.00
iv. Each grease trap……..………………………………………… 7.00
v. Each garage trap……………………………………………… 7.00
vi. Each bidet……………………………………………………. 4.00
vii. Each dental cuspidor……..…………………………………… 4.00
viii. Each gas-fired water heater……..…………………………… 4.00
ix. Each drinking fountain………………………………………… 2.00
x. Each bar or soda fountain sink……………………………… 4.00
xi. Each laundry sink……………………………………………… 4.00
xii. Each laboratory sink…………………………………………… 4.00
xiii. Each fixed-type sterilizer……………………………………… 2.00

d. Each water meter…………………………………………………………….. P 2.00

i. 12 to 25 mm……………………………………………… 8.00
ii. Above 25 mm……………………………………………. 10.00

e. Construction of septic tank, applicable in all Groups

i. Up to 5.00 cu. meters of digestion chamber …………… 24.00
ii. Every cu. meter or fraction thereof
in excess of 5.00 cu. meters………………………………
7.00

7. Electronics Fees

a. Central Office switching equipment, remote
switching units, concentrators, PABX/PBX’s, cordless/
wireless telephone and communication systems,
intercommunication system and other types of switching/
routing/distribution equipment used for voice, data
image text, facsimile, internet service, cellular, paging
and other types/forms of wired or wireless communications………………………………………………….………… P 2.40 per port

b. Broadcast station for radio and TV for both
commercial and training purposes, CATV headed, transmitting/
receiving/relay radio and broadcasting communications
stations, communications centers, switching centers,
control centers, operation and/or maintenance centers,
call centers, cellsites, equipment silos/shelters and
other similar locations/structures used for electronics and
communications services, including those used for navigational
aids, radar, telemetry, tests and measurements, global
positioning and personnel/vehicle location ………….……….. P 1, 000.00 per location

c. Automated teller machines, ticketing,
vending and other types of electronic dispensing machines,
telephone booths, pay phones, coin changers, location
or direction-finding systems, navigational equipment
used for land, aeronautical or maritime applications,
photography and reproduction machines x-ray,
scanners, ultrasound and other apparatus/equipment
used for medical, biomedical, laboratory and testing
purposes and other similar electronic or electronically-
controlled apparatus or devices, whether located
indoor or outdoors……………………………………..………………… P 10.00 per unit

d. Electronics and communications outlets
used for connection and termination of voice, data,
computer (including workstations, servers, routers, etc.),
audio, video, or any form of electronics and commu-
nications services, irrespective of whether a user
terminal is connected …………………………………..……..………. P 2.40 per outlet

e. Station/terminal/control point/port/central
or remote panels/outlets for security and alarm
systems (including watchman system, burglar
alarms, intrusion detection systems, lighting
controls, monitoring and surveillance system,
sensors, detectors, parking management system,
barrier controls, signal lights, etc.), electronics
fire alarm (including early-detection systems,
smoke detectors, etc.), sound-reinforcement/background,
music/paging/conference systems and the like,
CATV/MATV/CCTV and off-air television,
electronically-controlled conveyance systems, building
automation, management systems and similar types
of electronic or electronically-controlled installations
whether a user terminal is connected ………………….………. P 2.40 per
termination

f. Studios, auditoriums, theaters, and similar
structures for radio and TV broadcast, recording,
audio/video reproduction/simulation and similar
activities ………………………………………………………….. P 1,000.00 per location

g. Antenna towers/masts or other structures for
installation of any electronic and/or communications transmission/reception………………………………….…………P 1,000.00 per structure

h. Electronic or electronically-controlled indoor
and outdoor signages and display systems, including
TV monitors, multi-media signs, etc. ...………...…………….… P 50.00 per unit

i. Poles and attachment:

i. Per Pole (to be paid by pole owner)…….….……………………………. P 20.00
ii. Per attachment (to be paid by any
entity who attaches to the pole of others) …………….………………… 20.00

j. Other types or electronics or electronically-
controlled device, apparatus, equipment, instrument
or units not specifically identified above ..……….…………………….. P 50.00 per unit

8. Accessories of the Building/Structure Fees

a. All parts of buildings which are open on two (2) or more sides, such as balconies, terraces, lanais and the like, shall be charged 50% of the rate of the principal building of which they are a part (Sections 3.a. to 3.d. of this Schedule).
b. Buildings with a height of more than 8.00 meters shall be
charged an additional fee of twenty-five centavos (P 0.25)
per cu. meter above 8.00 meters. The height shall be
measured from the ground level up to the bottom of the
roof slab or the top of girts, whichever applies.

c. Bank and Records Vaults with interior volume
up to 20.00 cu. meters…..………………………………….…………………… P 20.00

i. In excess of 20.00 cu. meters…………….………………………………... 8.00

d. Swimming Pools, per cu. meter or fraction thereof:

i. GROUP A Residential…………………....………………………………… P 3.00
ii. Commercial/Industrial GROUPS B, E, F, G………………………………. 36.00
iii. Social/Recreational/Institutional GROUPS C, D, H, I…………………..… 24.00
iv. Swimming pools improvised from local
indigenous materials such as rocks, stones
and/or small boulders and with plain cement
flooring shall be charged 50% of the above rates.
v. Swimming pool shower rooms/locker rooms:
(a) Per unit or fraction thereof …….….………………………………... P 60.00
(b) Residential GROUP A………………………………………………. 6.00
(c) GROUP B, E, F, G, .....……………………………………………. 18.00
(d) GROUP C, D, H, .………………….………………………………. 12.00

e. Construction of firewalls separate from the building:

i. Per sq. meter or fraction thereof…………...……………………………… P 3.00
ii. Provided, that the minimum fee shall be ………………………………… 48.00

f. Construction/erection of towers: Including Radio and TV towers, water tank supporting structures and the like:

Use or Character of Occupancy Self-
Supporting Trilon
(Guyed)
i. Single detached dwelling units………………….… P 500.00 P 150.00
ii. Commercial/Industrial
(Groups B, E, F, G)
up to 10.00 meters in height…………………………

2,400.00

240.00
(a) Every meter or fraction
thereof in excess of 10.00 meters……………
120.00
12.00
iii. Educational/Recreational//Institutional
(Groups C, D, H, I)
up to 10.00 meters in height…………………………

1,800.00
120.00
(a) Every meter or fraction thereof
in excess of 10.00 meters……………………..
120.00
12.00

g. Storage Silos, up to 10.00 meters in height………………………………… P 2,400.00

i. Every meter or fraction thereof
in excess of 10.00 meters…………………………………..……..
150.00
ii. Silos with platforms or floors shall be
charged an additional fee in accordance
with Section 3.e. of this Schedule

h. Construction of Smokestacks and Chimneys for
Commercial/Industrial Use Groups B, E, F and G:

i. Smokestacks, up to 10.00 meters in
height, measured from the base…………………………………
P 240.00
(a) Every meter or fraction thereof in
excess of 10.00 meters……………………………………….
12.00
ii. Chimney up to 10.00 meters in
height, measured from the base…………………………………..
48.00
(a) Every meter or fraction thereof in excess
of 10.00 meters………………………………………………...
2.00

i. Construction of Commercial/Industrial Fixed Ovens,
per sq. meters or fraction thereof of interior floor areas ……………………P 48.00

j. Construction of Industrial Kiln/Furnace, per cu. meter or
fraction thereof of volume …………………………………………….………… 12.00

k. Construction of reinforced concrete or steel tanks or
above ground GROUPS A and B, up to 2.00 cu. meters………..………….. 12.00

i. Every cu. m or fraction thereof in excess
of 2.00 cu. meters…………………………………………………..
P 12.00
ii. For all other than Groups A and B
up to 10.00 cu. meters……………………………………………
480.00
(a) Every cu. meter or fraction thereof in
excess of 10.00 cu. meters………………………………..…
24.00

l. Construction of Water and Waste Water Treatment
Tanks: (Including Cisterns, Sedimentation and Chemical
Treatment Tanks) per cu. meter of volume.……..………………..…………. P 7.00

m. Construction of reinforced concrete or steel tanks
except for Commercial/Industrial Use:

i. Above ground, up to 10.00 cu. meters…………………………… P 480.00
Every cu. m or fraction thereof
in excess of 10.00 cu. meters……………………………………
480.00
ii. Underground, up to 20.00 cu. meters…………………………..… 540.00
Every cu. meter or fraction thereof
in excess of 20.00 cu.meters………………………………………
24.00


n. Pull-outs and Reinstallation of Commercial/Industrial Steel Tanks:

i. Underground, per cu. meter or fraction
thereof of excavation……………………………………………....
P 3.00
ii. Saddle or trestle mounted horizontal tanks,
per cu. meter or fraction thereof of volume of tank………………
3.00
iii. Reinstallation of vertical storage tanks shall be
the same as new construction fees in accordance
with Section 8.k. above.

o. Booths, Kiosks, Platforms, Stages and the like,
per sq. meter or fraction thereof of floor area:

i. Construction of permanent type………………………………….. P 10.00
ii. Construction of temporary type…………………………………… 5.00
iii. Inspection of knock-down temporary type, per unit …………… 24.00

p. Construction of buildings and other accessory structures
within cemeteries and memorial parks:

i. Tombs, per sq. meter of covered ground……………………… P 5.00
ii. Semi-enclosed mausoleums whether
canopied or not, per sq. meter of built-up area. …………………
5.00
iii Totally enclosed mausoleums, per sq. meter of
floor area ……………..……………………………………………
12.00
iv. Totally enclosed mausoleums, per sq. meter
of floor area ……………..………………………………………….
5.00
v. Columbarium, per sq. meter………………….………..…………. 18.00

9. Accessory Fees

a. Establishment of Line and Grade, all sides fronting
or abutting streets, esteros, rivers and creeks, first 10.00 meters…………..P 24.00

i. Every meter or fraction thereof in excess of 10.00 meters….………………..…2.40

b. Ground Preparation and Excavation Fee

i. While the application for Building Permit is still being processed, the Building Official may issue Ground Preparation and Excavation Permit (GP&EP) for foundation, subject to the verification, inspection and review by the Line and Grade Section of the Inspection and Enforcement Division to determine compliance to line and grade, setbacks, yards/easements and parking requirements.

(a) Inspection and Verification Fee ..……………………………….. areas …..……………………………………… P 200.00
(b) Per cu. meters of excavation …….……………………………… 3.00
(c) Issuance of GP & EP,
valid only for thirty (30) days or
superseded upon issuance of
Building Permit ………………….………………………………...


50.00
(d) Per cu. meter of excavation for
foundation with basement……..…….……………………………
4.00
(e) Excavation other than foundation
or basement, per cu. meter.……………………………………..
3.00
(f) Encroachment of footings or
foundations of buildings/structures to
public areas as permitted, per sq. meter or
fraction thereof of footing or foundation
encroachment ………………………………………………….....



250.00

c. Fencing Fees:

i. Made of masonry, metal, concrete up to
1.80 meters in height,
per lineal meter or fraction thereof…………………….……………….

P 3.00
ii. In excess of 1.80 meters in height,
per lineal meter or fraction thereof ……. ………………………………
4.00
iii Made of indigenous materials, barbed,
chicken or hog wires, per linear meter...……. ……………….………..
2.40

d. Construction of Pavements, up to 20.00 sq. meters…………………………. P 24.00

e. In excess of 20% or fraction thereof of paved
areas intended for commercial/industrial/institutional
use, such as parking and sidewalk areas,
gasoline station premises, skating rinks, pelota
courts, tennis and basketball courts and the like …………………………… P 3.00

f. Use of Streets and Sidewalks, Enclosures and
Occupancy of Sidewalks up to 20.00 sq. meters, per
calendar month …….……………………………………………………….. P 240.00

i. Every sq. meter or fraction thereof in excess of
20.00 sq. meters ………………………………………………………....
P 12.00

g. Erection of Scaffoldings Occupying Public Areas, per calendar month.

i. Up to 10.00 meters in length…….….………………………………….. P 150.00
ii. Every lineal meter or fraction thereof in
excess of 10.00 meters ………….……………………………………..
12.00

h. Sign Fees:

i. Erection and anchorage of display
surface, up to 4.00 sq. meters of signboard area…………………..…
P 120.00
(a) Every sq. meter or fraction thereof in
excess of 4.00 sq. meters…………………………………………..
24.00
ii. Installation Fees, per sq. meter or fraction thereof
of display surface:


Type of Sign Display Business Signs Advertising Signs
Neon P 36.00 P 52.00
Illuminated 24.00 36.00
Others 15.00 24.00
Painted-on 9.60 18.00



iii. Annual Renewal Fees, per sq. meter of display surface or fraction thereof:

Type of Sign Display Business Signs Advertising Signs
Neon P 36.00, min. fee shall be P 124.00 P 46.00, min. fee shall be P 200.00
Illuminated P 18.00, min. fee shall be P 72.00 P 38.00, min. fee shall be P 150.00
Others P 12.00, min. fee shall be
P 40.00 P 20.00, min. fee shall be P 110.00
Painted-on P 8.00, min. fee shall be
P 30.00 P 12.00, min. fee shall be P 100.00

i. Repairs Fees:

i. Alteration/renovation/improvement on
vertical dimensions of buildings/structures
in square meter, such as facades,
exterior and interior walls, shall be
assessed in accordance with the
following rate, For all Groups…………………………………………...




P 5.00
ii. Alteration/renovation/improvement on
horizontal dimensions of buildings/structures,
such as floorings, ceilings and roofing shall
be assessed in accordance with the
following rate, For all Groups ..……….………………………….……..



5.00
iii. Repairs on buildings/structures in all
Groups costing more than five thousand
pesos (P 5,000.00) shall be charged
1% of the detailed repair cost
(itemized original materials to be replaced
with same or new substitute and labor)

j. Raising of Buildings/Structures Fees:

i. Assessment of fees for raising of any buildings/structures shall be based on the new usable area generated.
ii. The fees to be charged shall be as prescribed under Sections 3.a. to 3.e. of this Schedule, whichever Group applies.

k. Demolition/Moving of Buildings/Structures Fees,
per sq. meter of area or dimensions involved:

i. Buildings in all Groups per sq. meter
floor area………………………………….……………………………… areas …..………………………………………
P 3.00
ii. Building Systems/Frames or portion
thereof per vertical or horizontal
dimensions, including Fences …….…….……………………………..

4.00
iii Structures of up to 10.00 meters in height……..……………………… 800.00
(a) Every meter or portion thereof
in excess of 10.00 meters …………………………………………
50.00
iv. Appendage of up to 3.00 cu. meter/unit……………………………….. 50.00
(a) Every cu. meter or portion thereof in
excess of 3.00 cu. meters………….……………………….……...
50.00
v. Moving Fee, per sq. meter of area of building/
structure to be moved …………………..……………………………..…
3.00



10. Certificates of Use or Occupancy (Table II.G.1. for fixed costing)

a. Division A-1 and A-2 Buildings:

i. Costing up to P150,000.00 ……..……..……………………………… P 100.00
ii. Costing more than P150,000.00
up to P400,000.00 ……………………..…………………………………
200.00
iii Costing more than P400,000.00 up
to P850,000.00……………………………..……………………………..
P 400.00
iv. Costing more than P850,000.00 up to
P1,200,000.00.……………….……………………………………………
800.00
v. Every million or portion thereof in excess
of P1,200,000.00………………………….……………….……………..
800.00

b. Divisions B-1/E-1, 2, 3/F-1/G-1, 2, 3, 4, 5/H-1, 2, 3, 4/and I-1 Buildings:

i. Costing up to P150,000.00…..……..…………………………………… P 200.00
ii. Costing more than P150,000.00
up to P400,000.00 ……………………..…………………………………
400.00
iii Costing more than P400,000.00 up
to P850,000.00……………………………..…………………………….
800.00
iv. Costing more than P850,000.00 up to
P1,200,000.00 ……………….……………………………………………
1,000.00
v. Every million or portion thereof in excess
of P1,200,000.00………………………….…………….………………..
1,000.00

c. Divisions C-1, 2/D-1, 2, 3 Buildings:

i. Costing up to P150,000.00 ……..……..………………………………. P 150.00
ii. Costing more than P150,000.00
up to P400,000.00 ……………………..…………………………………
250.00
iii Costing more than P400,000.00
up to P850,000.00……………………………..………………………….
600.00
iv. Costing more than P850,000.00
up to P1,200,000.00 ……………………………………………………..
900.00
v. Every million or portion thereof in excess
of P1, 200,000.00………………………….……………………………..
900.00

d. Division J-I Buildings/structures:

i. With floor area up to 20.00 sq. meters……………………………….. P 50.00
ii. With floor area above 20.00 sq. meters
up to 500.00 sq. meters …………………………………………………
240.00
iii With floor area above 500.00 sq. meters
up to 1,000.00 sq. meters………………………………………………..
360.00
iv. With floor area above 1,000.00 sq. meters
up to 5,000.00 sq. meters …………………………………………….…
480.00
v. With floor area above 5,000.00 sq. meters
up to 10,000.00 sq. meters………………………………………………..
200.00
With floor area above 10,000.00 sq. meters…………………………… 2,400.00

e. Division J-2 Structures:

i. Garages, carports, balconies, terraces, lanais and the like: 50% of the rate of the principal building, of which they are accessories.
ii. Aviaries, aquariums, zoo structures and the like: same rates as for Section 10.d. above.
iii Towers such as for Radio and TV transmissions, cell site, sign (ground or roof type) and water tank supporting structures and the like in any location shall be imposed fees as follows:
(a) First 10.00 meters of height from the ground P 800.00
(b) Every meter or fraction thereof in
excess of 10.00 meters….……………………………..
50.00

f. Change in Use/Occupancy, per sq. meter or fraction thereof
of area affected …………………………………………… ……………………P 5.00


11. Annual Inspection Fees

a. Divisions A-1 and A-2:

i. Single detached dwelling units and duplexes are not subject to annual inspections.
ii. If the owner request inspections, the fee for each
of the services enumerated below is ………………………..
P 120.00
Land Use Conformity
Architectural Presentability
Structural Stability
Sanitary and Health Requirements
Fire-Resistive Requirements


b. Divisions B-1/D-1, 2, 3/E-1, 2, 3/F-1/G-1, 2, 3, 4, 5/ H-1, 2, 3, 4/
and I-1, Commercial, Industrial Institutional buildings and
appendages shall be assessed area as follows:

i. Appendage of up to 3.00 cu. meters/unit……………………………… P 150.00
ii. Floor area to 100.00 sq. meters……………………………………….. 120.00
iii Above 100.00 sq. meters up to
200.00 sq. meters……………………………………..……..…..……….
240.00
iv. Above 200.00 sq. meters up to
350.00 sq. meters……………………………………………..……..……
80.00
v. Above three hundred 350.00 sq. meters
Up to 500.00 sq. meters.…………..….……………………………..……
720.00
vi. Above 500.00 sq. meters up to
750.00 sq. meters……………………………………………… ….…….
960.00
vii. Above 750.00 sq. meters
up to 1,000.00 sq. meters…………………………………………...…..
1,200.00
viii. Every 1,000.00 sq. meters or
its portion in excess of
1,000.00 sq. meters…………………………………… ………………..

1,200.00


c. Divisions C-1, 2, Amusement Houses, Gymnasia and the like:

i. First class cinematographs or theaters..……………………………… P 1,200.00
ii. Second class cinematographs or theaters.....………………………… 720.00
iii Third class cinematographs or theaters..……………………………… 520.00
iv. Grandstands/Bleachers, Gymnasia and the like……………………… 720.00

d. Annual plumbing inspection fees, each
plumbing unit …………………………………..…….…………………………. P 60.00



e. Electrical Inspection Fees:

i. A one time electrical inspection fee equivalent to 10% of Total Electrical Permit Fees shall be charged to cover all inspection trips during construction.

ii. Annual Inspection Fees are the same as in Section 4.e.

f. Annual Mechanical Inspection Fees:

i. Refrigeration and Ice Plant, per ton:
(a) Up to 100 tons capacity ..…...... …………………………………… P 25.00
(b) Above 100 tons up to 150 tons .……………………………………… 20.00
(c) Above 150 tons up to 300 tons …………………………………….. 15.00
(d) Above 300 tons up to 500 tons…….…. ………………………….... 10.00
(e) Every ton or fraction thereof above 500 tons……. ………………... 5.00
ii. Air Conditioning Systems:
Window type air conditioners, per unit …. ………………………………. P 40.00
iii. Packaged or centralized air conditioning systems:
(a) First 100 tons, per ton …………………………………………………. 25.00
(b) Above 100 tons, up to 150 tons per ton …….……………………….. 20.00
(c) Every ton or fraction thereof above 500 tons ..…………………… 8.00
iv. Mechanical Ventilation, per unit, per kW:
(a) Up to 1 kW …………………………………………………………..…. P 10.00
(b) Above 1 kW to 7.5 kW ……………………………………………… 50.00
(c) Every kW above 7.5 kW .……………………………………….…..… 20.00
v. Escalators and Moving Walks; Funiculars and the like:
(a) Escalator and Moving Walks, per unit…………………………….… P 120.00
(b) Funiculars, per kW or fraction thereof.……………………………... 50.00
(c) Per lineal meter or fraction thereof of travel.…...………………..... 10.00
(d) Cable Car, per KW or fraction thereof ……………………………… 25.00
(e) Per lineal meter of travel..……………………………………………… 2.00
vi. Elevators, per unit:
(a) Passenger elevators…….……………………………………………… P 500.00
(b) Freight elevators.……………………………………………………….. 400.00
(c) Motor driven dumbwaiters…………………………………………….. 50.00
(d) Construction elevators for materials ……………………………….. 400.00
(e) Car elevators ….….…………………………………………………..… 500.00
(f) Every landing above first five (5)
landings for all the above elevators…………………………………..
50.00
vii. Boilers, per unit:
(a) Up to 7.5 kW…………………………………………………………..… P 400.00
(b) 7.5 kW up to 22 kW ………………………………………………….... 550.00
(c) 22 kW up to 37 kW ……….……………….………………………….... 600.00
(d) 37 kW up to 52 kW……………………………………………………... 650.00
(e) 52 kW up to 67 kW ……….……………………………………………. 800.00
(f) 67 kW up to 74 kW…………………………. …………………………. 900.00
(g) Every kW or fraction thereof
above 74 kW ……………………………………………………………
4.00
viii. Pressurized Water Heaters, per unit………………………………………. P 120.00
ix. Automatic Fire Extinguishers,
per sprinkler head……………………………………………………………
P 2.00
x. Water, Sump and Sewage pumps for
buildings/structures for commercial/
industrial purposes, per kW:
(a) Up to 5 kW………………………….………………………………… P 55.00
(b) Above 5 kW to 10 kW………………………………………………….. 90.00
(c) Every kW or fraction thereof
above 10 kW……………………………………………………………..
P 2.00
xi. Diesel/Gasoline Internal Combustion
Engine, Gas Turbine/Engine, Hydro, Nuclear
or Solar Generating Units and the like, per kW:
(a) Per kW, up to 50 kW…………………………………………………… P 15.00
(b) Above 50 kW up to 100 kW……………………………………………. 10.00
(c) Every kW or fraction thereof
above 100 kW……………………………………………………………
2.40
xii. Compressed air, vacuum, commercial/
institutional/industrial gases, per outlet……………………………………
P 10.00
xiii. Power piping for gas/steam/etc.,
per lineal meter or fraction thereof or
per cu. meter or fraction thereof,
whichever is higher…………………………………………………………..


P 2.00
xiv. Other Internal Combustion Engines,
including Cranes, Forklifts, Loaders,
Mixers, Compressors and the like,
(a) Per unit, up to 10 kW…………………………………………………… 100.00
(b) Every kW above 10 kW……………………………………………… 3.00
xv. Other machineries and/or equipment
for commercial/ industrial/institutional
use not elsewhere specified, per unit:
(a) Up to ½ kW……………………………………………………………… P 8.00
(b) Above ½ kW up to 1 kW………………………………………………. 23.00
(c) Above 1 kW up to 3 kW………………………………………………… 39.00
(d) Above 3 kW up to 5 kW……………………………………………… 55.00
(e) Above 5 kW up to 10 kW………………………………………………. 80.00
(f) Every kW above 10 kW
or fraction thereof………………………………………………………..
4.00
xvi. Pressure Vessels, per cu. meter
or fraction thereof…………………………………………………………….
P 40.00
xvii. Pneumatic tubes, Conveyors, Monorails
for materials handling, per lineal meter
or fraction thereof…………………………………………………………….

P 2.40
xviii. Weighing Scale Structure, per ton or fraction thereof…………………… P 30.00
xix. Testing/Calibration of pressure gauge,
per unit………………………………………………………………………..
P 24.00
(a) Each Gas Meter, tested, proved
and sealed, per gas meter……………………………………………..
30.00
xx. Every mechanical ride inspection, etc.,
used in amusement centers of fairs, such
as ferris wheel, and the like, per unit………………………………………

P 30.00

g. Annual electronics inspection fees shall be the same as the fees in Section 7. of this Schedule.

12. Certifications:

a. Certified true copy of building permit………………………………………………P 50.00

b. Certified true copy of Certificate of Use/Occupancy….…………………………. 50.00

c. Issuance of Certificate of Damage………………...…………………………..….. 50.00

d. Certified true copy of Certificate of Damage…………………………..…………. 50.00

e. Certified true copy of Electrical Certificate………………………………………… 50.00

f. Issuance of Certificate of Gas Meter Installation………………………….………P 50.00

g. Certified true copy of Certificate of Operation…………..………………………… 50.00

h. Other Certifications…..……………………….………..……………………………. 50.00


NOTE: The specifications of the Gas Meter shall be:

Manufacturer…………………………………………………..
Serial Number…………………………………………………
Gas Type……………………………………………………….
Meter Classification/Model……………………………………
Maximum Allowable Operating Pressure – psi (kPa)………
Hub Size - mm (inch)…………………………………………
Capacity - m3/hr. (ft3/hr.)………………………………………

Nothing follows.
Back to top Go down
https://revitpinoy.darkbb.com
 
P.D. No. 1096
Back to top 
Page 1 of 1

Permissions in this forum:You cannot reply to topics in this forum
Revit Pinoy :: General Forum :: RPinoy News-
Jump to:  
Create a forum on Forumotion | ©phpBB | Free forum support | Report an abuse | Cookies | Forumotion.com